• Skip to main content
  • Home
  • About
    • All
    • Donate
    • Jurisdiction Search
    • Letter Guidelines
    • OCN App
    • Privacy Policy
    • Request Event Listing
    • Sign Up for Newsletter
    • Subscribe to OCN
    • Volunteer
  • Advertise
    • All
    • Ad Layout Guidance
    • FAB Rewards Program
    • FAQs
    • Sign Up for Ad Info Emails
    • Purchase Ad Space
    • Testimonials
  • Archive
    • All
    • 2026
    • 2025
    • 2024
    • 2023
  • CALENDAR
    • All
    • Governmental Entities
    • Homeowners’ Associations
    • Special Events
    • Weekly & Monthly
  • Contact Us
  • E-Edition
  • Sitemap
  • Topics
  • SEARCH
OCN

OCN

Volunteers reporting on community issues in Monument, Palmer Lake, and the surrounding Tri-Lakes area

OCN > 2408 > Monument Sanitation District, July 17 – Repair completed without blocking traffic

Monument Sanitation District, July 17 – Repair completed without blocking traffic

August 3, 2024

  • No spot repair needed
  • Manager’s report
  • Newsletter gets final edits

By Jackie Burhans and James Howald

The Monument Sanitation District (MSD) board met in July to hear a report from District Manager Mark Parker and to discuss final edits to the district’s newsletter, The Pipeline.

No spot repair needed

Parker told the board that repairs to the pipeline running under Highway 105 were complete, and a spot repair anticipated at the last board meeting was found to be unnecessary. Had the spot repair been needed, excavation would have been required and traffic on Highway 105 would have been impacted. Aegion/Insituform, the contractor repairing the pipeline, was able to complete the repair simply by lining the pipeline with no need to excavate, Parker said.

Manager’s report

In his manager’s report, Parker said that Streamline had been hired to bring the district’s website into compliance with the requirements of HB 21-1110 and with the requirements of the Americans with Disabilities Act. Streamline will monitor the website continuously and do all required monthly and quarterly reporting to the state, Parker said, at a cost lower than the cost to the district if the work was done in-house. The website will be completely redone but will retain the same URL as the current page, Parker said. MSD staff will continue to manage the information that is published on the page.

Parker also announced that the district was planning to replace its current accounting company, Haynie & Co., with Numeric Strategies LLC, a company headquartered in Monument. Staff turnover at Haynie & Co. contributed to the decision to make a change, Parker said.

Finally, Parker said the Willow Springs Ranch neighborhood, just south of the Town of Monument, had reached complete buildout. Willow Springs Ranch is part of the MSD service area.

Newsletter gets final edits

The Pipeline, a newsletter to be published by MSD and drafted by Directors Janet Ladowski and John Howe, was reviewed by the board. The newsletter will keep customers up to date on district issues. Howe said he wanted to add some wording to the newsletter pointing out that MSD is not affiliated with the Town of Monument. Operations Manager James Kendrick said that MSD is a “separate and distinct public utility.”

**********

Monument Sanitation District meetings are held at 9 a.m. on the third Wednesday of the month in the district conference room at 130 Second St., Monument. The next regular meeting is scheduled for Aug. 21. See colorado.gov/msd. For a district service map, see colorado.gov/pacific/msd/district-map-0. Information: 719-481-4886.

Jackie Burhans can be reached at jackieburhans@ocn.me.

James Howald can be reached at jameshowald@ocn.me.

Other Monument Sanitation District (MSD) articles

  • Monument Sanitation District, Feb. 18 – Work on Beacon Lite Road proceeds (3/4/2026)
  • Monument Sanitation District, Jan. 21 – Buc-ee’s advances sewer plan (2/4/2026)
  • Monument Sanitation District, Dec. 17 – 2026 budget approved; compensation debated (12/31/2025)
  • Monument Sanitation District, Nov. 19 – Draft of 2026 budget reviewed (12/4/2025)
  • Monument Sanitation District, Oct. 15 – Draft of 2026 budget reviewed (10/30/2025)
  • Monument Sanitation District, Sept. 17 – Beacon Lite Road due for upgrades (10/2/2025)
  • Monument Sanitation District, Aug. 20 – Parker explains Buc-ee’s wastewater estimate (9/4/2025)
  • Monument Sanitation District, July 16 – Buc-ee’s potential impact studied (8/1/2025)
  • Monument Sanitation District, June 18 Raspberry Point sewage spill resolved (7/3/2025)
  • Monument Sanitation District, May 21 – Manhole overflow threatens Monument Lake (6/7/2025)
<- Forest Lakes Metropolitan District/Pinon Pines Metropolitan Districts 2 and 3, July 15 and Pinon Pines Metropolitan District 1, July 22 – 2023 audits receive clean opinions
-> Triview Metropolitan District, July 18 – Northern Delivery System complete; land annexation approved

CLICK HERE FOR PODCASTS or OCN UPDATES --- SIGN UP FOR: NEWSLETTERS or ADINFO --- RSS FEEDS: ARTICLES or PODCASTS or COMMENTS
Privacy Policy --- Copyright © 2001–2026. Our Community News, Inc., All rights reserved.

Accessibility Adjustments

Powered by OneTap

Accessibility Commitment for Our Community News, Inc.

At Our Community News, Inc., we are committed to making our digital presence as accessible and inclusive as reasonably possible for all users, including individuals with disabilities. Our goal is to improve the usability of wp.ocn.me and to support a more accessible experience for everyone, regardless of their abilities or the technologies they use.

Our Approach to Accessibility

We aim to align with the Web Content Accessibility Guidelines (WCAG), which define internationally recognized standards for digital accessibility. While full compliance cannot always be guaranteed, we strive to implement improvements where feasible and regularly review accessibility-related aspects of our website. Accessibility is an ongoing process, and we are committed to improving the experience over time as technologies, standards, and user needs evolve.

Accessibility Features

To support accessibility, wp.ocn.me may utilize tools such as the OneTap accessibility toolbar. This interface provides users with a range of helpful features, including:
  • Adjustable text size and contrast settings
  • Dark mode for those who prefer that presentation
  • Highlighting of links and text for better visibility
  • Quick launch via keyboard shortcut: Alt + . (Windows) or ⌘ + . (Mac)
Please note the following:
  • The availability and effectiveness of these features depend on the website's configuration and ongoing maintenance.
  • While we strive to ensure accessibility, we cannot guarantee that every part of wp.ocn.me will be fully accessible at all times. Some content may be provided by third parties or affected by technical constraints beyond our immediate control.

Accessibility Tools

We implemented an accessibility icon on the upper right of the screen. It is a figure with arms and legs outstretched in a dark gray circle. Clicking on the accessibility icon will open a toolbar with many options to adjust the text and the screen. We also implemented a dark mode tool, which appears to the left of the accessibility icon as a smaller circle that initially is half-gray and half yellow indicating the screen will adjust to the system’s dark mode setting. Clicking on the dark mode tool will switch it to a sun icon meaning light mode. Clicking again will switch it to a moon icon meaning dark mode. Clicking again brings it back to half-and-half. If the accessibility tools are obstructing something you want to view, you can open the accessibility toolbar and select "Hide toolbar." Leave the setting at the default of “Only for this session” and click Hide Toolbar. That will reveal a small dark circle containing a minus sign. If you click on the minus sign, the dark mode tool will be removed and the minus will change to a plus. Click on the plus sign to bring back the accessibility icon and the dark mode tool.

Feedback and Contact

We welcome your feedback. If you experience any accessibility barriers or have suggestions for improvement, please contact us: Email: johnheiser@ocn.me We are committed to reviewing all inquiries and aim to respond within 3–5 business days. If you require assistance accessing any part of this website, we are happy to provide support through alternative channels upon request. Last updated: November 3, 2025
How long do you want to hide the accessibility toolbar?
Hide Toolbar Duration
Colors
Orientation
Version 2.5.1

Keep up-to-date on Tri-Lakes area news and upcoming events with our free OCN App!

Check It OutAlready InstalledNo, Thanks

Subscribe to our newsletter for the latest Tri-Lakes news and website updates!

Sign Up NowAlready SubscribedNo, Thanks