• Skip to main content
  • Home
  • About
    • All
    • Donate
    • Jurisdiction Search
    • Letter Guidelines
    • OCN App
    • Privacy Policy
    • Request Event Listing
    • Sign Up for Newsletter
    • Subscribe to OCN
    • Volunteer
  • Advertise
    • All
    • Ad Layout Guidance
    • FAB Rewards Program
    • FAQs
    • Sign Up for Ad Info Emails
    • Purchase Ad Space
    • Testimonials
  • Archive
    • All
    • 2026
    • 2025
    • 2024
    • 2023
  • CALENDAR
    • All
    • Governmental Entities
    • Homeowners’ Associations
    • Special Events
    • Weekly & Monthly
  • Contact Us
  • E-Edition
  • Sitemap
  • Topics
  • SEARCH
OCN

OCN

Volunteers reporting on community issues in Monument, Palmer Lake, and the surrounding Tri-Lakes area

OCN > 2508 > Donala Water and Sanitation District, July 17 – Board tours treatment facility, adjusts sewer bills

Donala Water and Sanitation District, July 17 – Board tours treatment facility, adjusts sewer bills

August 1, 2025

  • Wastewater treatment facility tour
  • Bills adjusted for snowbirds and leaks
  • Operational Reports
  • Executive session

By James Howald and Jackie Burhans

The Donala Water and Sanitation District (DWSD) board met in July at the Upper Monument Creek Regional Wastewater Treatment Facility (UMCRWWTF) to tour the facility and to amend the policies by which sewer bills are calculated in two problem cases. The board also heard operational reports and held an executive session.

Wastewater treatment facility tour

Waste Plant Operator Aaron Tolman led the board on a tour of the UMCRWWTF, which is located at 14770 Jumping Mouse View. He highlighted the facility’s Programmable Logic Controller (PLC), which was upgraded over the past year. The PLC controls the operation of the treatment facility and is the center of its Supervisory Control and Data Acquisition (SCADA) system. The PLC upgrades provide more granular control over the facility’s components and processes and replaced manual controls with more precise digital controls, resulting in savings on energy costs and adding redundancy to operations. The upgrades also improve the purity of the effluent that is released into Monument Creek. Board President Wayne Vanderschuere said the upgrades were also designed to improve the cybersecurity of the facility.

Above: At its July 17 workshop, Aaron Tolman, waste plant operator for Donala Water and Sanitation District (DSWD), gave a tour of the Upper Monument Creek Regional Wastewater Treatment Facility. The tour included a glimpse at the newly installed Programmable Logic Controller shown above that automates the plants functions, the digester that breaks down organic matter present in sludge, and the compactor that removes excess water from the biosolids before they are hauled away to landfills. Photo by Jackie Burhans.
Above: The interior of the wastewater digester. Donala is a co-owner and operator of the Upper Monument Creek Regional Wastewater Treatment Facility. along with TriView Metro District and Forest Lakes Metro District. Photo by Jackie Burhans.

Bills adjusted for snowbirds and leaks

At the July meeting, the board voted on Resolution 2025-4, which changes the way sewer bills are calculated for customers who have water leaks or who spend the winter months outside the district. The changes were discussed in detail at the board meeting in May. That discussion can be found here: https://wp.ocn.me/v25n6dwsd/.

DWSD uses water consumption during the winter months to calculate each customer’s sewer bill. This method assumes that none of the water used during the winter months is used for irrigation and, therefore, during the winter months, a gallon of water used creates a gallon of wastewater. This method creates two problem cases: if a customer has a water leak during the winter months, that results in too high a charge for sewer service, and if a customer spends the winter months outside the district, that results in too low a charge. The resolution provides for a Water Leak Adjustment program to address the first case and specifies that the district’s annual lower quartile consumptive average will be used to calculate sewer bills in the second case.

Vanderschuere pointed out that no changes were being made to rates.

The board voted unanimously in favor of the resolution.

Operational Reports

In his Manager’s Report, General Manager Jeff Hodge suggested the district hold an open house for customers as part of the district’s public outreach efforts. The open house would be an opportunity to thank residents living near the Well 7D drilling site for their patience and understanding for the disruption caused by the drilling operation, and a chance to educate the public about the district’s operations. He proposed Thursday, Sep. 25 from 4 to 7 p.m. for the open house.

Hodge also updated the board on the status of the Well 7D redrilling project. The well is done, he said, and water testing is underway. Helen Malenda-Lawrence of LRE Water is calculating the amount the district’s water rights will allow it to pump from the well. The Colorado Department of Health and the Environment will need to provide the permit for the well. Preliminary tests show good water quality, Hodge said, adding he expected the well to produce 200 gallons per minute.

In his Water Report, Superintendent of Water Operations Ronny Wright told the board repair work on the lid of the east water tank was complete and the next step would be to sandblast the west water tank.

In his Wastewater Report, Tolman said Timberline Building Systems had installed an ultrasonic flow transducer in the flume through which the UMCRWWTF discharges treated effluent into Monument Creek. The transducer is integrated with the facility’s SCADA system.

Executive session

The meeting ended with an executive session to receive legal advice from counsel regarding the district’s pending water court application in Case No. 24CW3019.

**********

The next board meeting has been moved to Thursday, Aug. 14 at 1:30 p.m. Generally, board meetings are held the third Thursday of the month at 1:30 p.m. and include online access; call (719) 488-3603 or access www.donalawater.org to receive up-to-date meeting information. The district office is located at 15850 Holbein Drive, Colorado Springs.

James Howald can be reached at jameshowald@ocn.me. Jackie Burhans can be reached at jackieburhans@ocn.me

Other Donala Water and Sanitation District articles

  • Donala Water and Sanitation District, Jan. 15 – 2026 rates and fees amended (2/4/2026)
  • Donala Water and Sanitation District, Dec. 11 – 2026 budget adopted (12/31/2025)
  • Donala Water and Sanitation District, Nov. 20 – Water rights and exchange options reviewed (12/4/2025)
  • Donala Water and Sanitation District, Oct. 9 – 2026 budget planning (10/30/2025)
  • Donala Water and Sanitation District, Sept. 11 – 2026 budget planning kicks off (10/2/2025)
  • Donala Water and Sanitation District, Aug. 13, 22 – General manager on administrative leave (9/4/2025)
  • Donala Water and Sanitation District, June 12 – Positive audit report; inconsistent waste treatment numbers (7/3/2025)
  • Donala Water and Sanitation District, May 5 – Directors sworn in; district offices temporarily closed (6/7/2025)
  • Donala Water and Sanitation District, April 17 – Workshop covers finances, water supply (5/3/2025)
  • Donala Water and Sanitation District, Mar. 27 – New water and sewer rates take effect (4/5/2025)
<- Monument Sanitation District, July 16 – Buc-ee’s potential impact studied
-> Triview Metropolitan District – 2024 audit receives unmodified opinion; construction bid awarded

Reader Interactions

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *


CLICK HERE FOR PODCASTS or OCN UPDATES --- SIGN UP FOR: NEWSLETTERS or ADINFO --- RSS FEEDS: ARTICLES or PODCASTS or COMMENTS
Privacy Policy --- Copyright © 2001–2026. Our Community News, Inc., All rights reserved.

Accessibility Adjustments

Powered by OneTap

Accessibility Commitment for Our Community News, Inc.

At Our Community News, Inc., we are committed to making our digital presence as accessible and inclusive as reasonably possible for all users, including individuals with disabilities. Our goal is to improve the usability of wp.ocn.me and to support a more accessible experience for everyone, regardless of their abilities or the technologies they use.

Our Approach to Accessibility

We aim to align with the Web Content Accessibility Guidelines (WCAG), which define internationally recognized standards for digital accessibility. While full compliance cannot always be guaranteed, we strive to implement improvements where feasible and regularly review accessibility-related aspects of our website. Accessibility is an ongoing process, and we are committed to improving the experience over time as technologies, standards, and user needs evolve.

Accessibility Features

To support accessibility, wp.ocn.me may utilize tools such as the OneTap accessibility toolbar. This interface provides users with a range of helpful features, including:
  • Adjustable text size and contrast settings
  • Dark mode for those who prefer that presentation
  • Highlighting of links and text for better visibility
  • Quick launch via keyboard shortcut: Alt + . (Windows) or ⌘ + . (Mac)
Please note the following:
  • The availability and effectiveness of these features depend on the website's configuration and ongoing maintenance.
  • While we strive to ensure accessibility, we cannot guarantee that every part of wp.ocn.me will be fully accessible at all times. Some content may be provided by third parties or affected by technical constraints beyond our immediate control.

Accessibility Tools

We implemented an accessibility icon on the upper right of the screen. It is a figure with arms and legs outstretched in a dark gray circle. Clicking on the accessibility icon will open a toolbar with many options to adjust the text and the screen. We also implemented a dark mode tool, which appears to the left of the accessibility icon as a smaller circle that initially is half-gray and half yellow indicating the screen will adjust to the system’s dark mode setting. Clicking on the dark mode tool will switch it to a sun icon meaning light mode. Clicking again will switch it to a moon icon meaning dark mode. Clicking again brings it back to half-and-half. If the accessibility tools are obstructing something you want to view, you can open the accessibility toolbar and select "Hide toolbar." Leave the setting at the default of “Only for this session” and click Hide Toolbar. That will reveal a small dark circle containing a minus sign. If you click on the minus sign, the dark mode tool will be removed and the minus will change to a plus. Click on the plus sign to bring back the accessibility icon and the dark mode tool.

Feedback and Contact

We welcome your feedback. If you experience any accessibility barriers or have suggestions for improvement, please contact us: Email: johnheiser@ocn.me We are committed to reviewing all inquiries and aim to respond within 3–5 business days. If you require assistance accessing any part of this website, we are happy to provide support through alternative channels upon request. Last updated: November 3, 2025
How long do you want to hide the accessibility toolbar?
Hide Toolbar Duration
Colors
Orientation
Version 2.5.1

Keep up-to-date on Tri-Lakes area news and upcoming events with our free OCN App!

Check It OutAlready InstalledNo, Thanks

Subscribe to our newsletter for the latest Tri-Lakes news and website updates!

Sign Up NowAlready SubscribedNo, Thanks